top of page

Engineering

Keeping the Lights on in High Level Waste Plants

About the client

Lorem ipsum dolor sit amet consectetur. Gravida sed morbi porttitor posuere. Elit at viverra massa sed nunc posuere donec aliquet ultricies. Duis volutpat bibendum lacus rutrum quis urna augue. Habitant massa tristique diam ut facilisis non sed iaculis vitae.

Quis at nisi velit ac nunc molestie. Egestas netus aliquam et viverra nibh eu. Id amet adipiscing risus mi. Elementum nec nulla dignissim arcu commodo mi purus ut massa. Non nisl odio proin sed in praesent. Lectus sit enim est integer ut proin. Pellentesque amet porttitor mi viverra lacus orci pharetra ultrices.

📍 Location UK

💼 Industry

⚙️ Innovation Management

Co-Lab has consistently delivered these projects in a structured and organised manner, keeping teams engaged, motivated, and results driven.

- Viv Winter, Head of Business Improvements, Sellafield Ltd, Legacy Ponds

Asset Management Assessment for UK Decommissioning.png
Challenges

Critical Shortage of Bespoke Nuclear Lamp Holders

Bespoke lamp holder, used to illuminate nuclear process cells. Previous supplier ceased trading with spares on plant running critically low.

Solution

Reverse Engineered Solution with Additive Manufacturing Upgrade

Reverse engineering of the assembly, replacing the previous injection-moulded main body with an AM alternative.

Process

Development process steps

The development process starts with Material analysis and recommendation from SL Polymer CoE, conducted by the Plant-Facing Design Office. This is followed by Prototyping and design refinement at Engineering CoE, focusing on innovative solutions. Next, Manufacturing a polymer by a qualified high-grade polymer supplier with decades of AM experience ensures quality production. The process then moves to Full component assembly and testing by local supply chain, ensuring integration and functionality. Finally, the product reaches Deployment, marking its operational use.

Benefits

Risk Eliminated, Costs Reduced, and AM Successfully Deployed

Delivery of this alternative solution eliminated the risk of running out of spares and impacting production throughput.

The new lamp holder assembly is supplied at a lower cost than the original.

Successful deployment of a QG03 additively manufactured item to site.